RSI

Code: PRJ-2015

Rwanda Statistics Institute Rehabilitation

Muhima, Kigali, Rwanda

Scale

KSh 150,000,000

Status

Complete

SEC-01Project Overview

The rehabilitation of the National Institute of Statistics of Rwanda's Kigali office complex was one of Civicrete's first major international projects, executed on behalf of the Government of Rwanda. The project covered the design of all mechanical, electrical, and fire-fighting systems for the rehabilitation of the Muhima office blocks. A significant emphasis was placed on energy efficiency in both the electrical and mechanical designs — a key client priority. Civicrete's team developed the full design from schematic through to construction documentation, provided expertise to the construction team during implementation, and led the final commissioning of all building services systems.

SEC-02Engineering Challenges
C-01

International Standards Compliance

The project required compliance with both Rwandan building regulations and international standards for government institutional buildings — requiring careful standards harmonisation across all systems.

C-02

Energy Efficiency Mandate

The Government of Rwanda required demonstrable energy efficiency improvements. This drove selection of efficient HVAC plant, LED lighting systems, and building management system integration.

C-03

Working in an Occupied Building

Parts of the office block remained occupied during construction, requiring careful sequencing of works, dust containment, and coordination of service isolations to minimise disruption to government staff.

SEC-03Execution Framework
01

Client Brief Development

Evaluation of spatial specifications and M&E performance requirements

02

Schematic Design

Mechanical, electrical, and fire-fighting system layouts and concept

03

Detailed Design

Full M&E calculations, drawings, and specifications for client and architect approval

04

Drawing Submission

Electrical and mechanical services drawings submitted to client and architects

05

Construction Supervision

Site monitoring, quality control, and technical instruction issue

06

System Testing

Pre-commissioning tests on all electrical, mechanical, and fire protection systems

07

Commissioning

Full system commissioning and handover to government client